Work-Station (m) | Tasks assigned for each workstation | Station Time (min.) | Idle Time (min.) |
1 | 1,2 | 58.44 | 93.89 |
2 | 3,4,5,6,7,8,9,10,11,12,13,14,15,16 | 132.42 | 19.91 |
3 | 17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37 | 46.31 | 106.02 |
4 | 38,39,40,41,42,43,44,45,46,47,48 | 152.33 | 0.00 |
5 | 49,50,51,52,53,54,55,56,57,58,59,60,61,62,63 | 70.13 | 82.20 |
The total idle time (Tid) = 303.02 min., The workload variance (wv) = 1,793.10, The line efficiency (E) = 60.35%. |